5.2 Su mmary of Aspects(New Energy Options)

A1 Aspect:Govern ment and pr oponent policies
Assessing the co mprehensiveness of gover n ment policies(including t heir adequacy in relation to accepted sustainability standards,inter national obligations,and et hics)and the co mpatibility of t he scheme(and proponent policies)with those government policies.In the absence of effective government policies,measuring the ability to ensure good practice in spite of this.

A2 Aspect:Political risk and regulat ory approval
Measuring t he level of sovereign risk and likelihood of regulator y appr oval.

A3 Aspect:De monstrated need f or the project
Assessing,either by regulator y authorities or t he proponent,to demonstrate a need for the project:
These assess ments should include:
•evidence of likely f uture energy requirements,
•evaluation of a range of alternative options(including practicable efficiency measures)to meet those requirements,and
•evidence that t his project is the best option to meet those requirements.

A4 Aspect:Site selection and design opti misation
Measuring the planning f or,or implementation of site selection and design optimisation that:
•avoids exceptional envir on mental and cult ural heritage sites,
•mini mises distur bance to existing features and activities,and
•maxi mises econo mic,social,and environ mental opportunities.

A5 Aspect:Project manage ment risk
Assessing the proponent’s ability to design and construct the project.

A6 Aspect:Project finance risk
Assessing the finance availability and ter ms for the design and construction phases of the project.

![]()
A7 Aspect:Econo mic viability and ser vice delivery
Analysing the short and long-ter m econo mic viability of the project and the likelihood of it achieving its econo mic and ser vice deliver y objectives.

A8 Aspect:Markets,innovation and research
Understanding of short and long-ter m market conditions and ability to respond to potential changes through,for example,research and develop ment programs.

A9 Aspect:Additional econo mic benefits and capacity building
Assessing the range and value of additional benefits associated with the scheme and the potential for them to be effectively delivered.

A10 Aspect:Suppliers and partners(https://www.daowen.com)
Assessing the level of consideration of sustainability issues in the procurement of goods and services.

A11 Aspect:Short and long-ter m reliability
Assessing t he likely reliability of the power scheme in the context of the br oader system.

A12 Aspect:Planned operational efficiency
Assessing the planned operational efficiency of the project in the context of the broader system and relevant mar ket arrangements.It is also assessing the efficiency of the conversion of pri mary ener gy to electrical ener gy and the relative efficiency of the pr oposed option as co mpared to si milar technology options.

A13 Aspect:Co mmunity acceptance
Assessing the likely degree of community support for the project and the planning for and processes used to gain that support.It also assesses plans for ongoing stakeholder feedback,and measurement and reporting of sustainability perf or mance.

A14 Aspect:Social i mpact assess ment and manage ment planning
Examining the suitability,adequacy,and effectiveness,of social i mpact assess ments or plans to carry out assessments.It is also examining the acceptance and likelihood of successf ul implementation of compensation,mitigation,and/or enhancement strategies.

A15 Aspect:Extent and severity of social,economic,and cultural i mpacts on directly affected stakeholders
Measuring the extent and severity of social,econo mic,and cult ural i mpacts on directly affected stakeholders(including vulnerable social groups).It is also looking at likely effectiveness of plans to pr ovide enhancements,avoid i mpacts and/or mitigate and co mpensate for those i mpacts.

A16 Aspect:Saf et y issues and hazar ds
Assessing asset safety,public safety,employee safety.

A17 Aspect:Cultural heritage
Looking at the level of i mpact and planning f or protection and conservation of historic and indigenous heritage values.

A18 Aspect:Envir on mental i mpact assess ment and manage ment planning
Examining t he suitability,adequacy,and effectiveness,of environ mental i mpact assess ments or plans to carr y out assess ments.It is also examining the acceptance and likelihood of successf ul i mplementation of compensation,mitigation,and/or enhancement strategies.

A19 Aspect:Extent and severity of predicted envir on mental i mpacts
Measuring t he predicted extent and severity of envir on mental i mpact due to the project.This extent and severity of i mpact relates to:
•t he areal extent affected,both on a direct and indirect(incremental)basis,
•the amount of potential detrimental or positive impact,
•the value of the environ ment upon which the impact occurs,and
•t he degree to which it can be avoided,mitigated,co mpensated,or enhanced.
Environ mental value relates to uniqueness,rarity,and existence of threatened or endangered species or habitat.

A20 Aspect:Waste pr oducts,including greenhouse gas e missions
Assessing projected wastes generation and greenhouse gas emissions over the life of the scheme in ter ms of quantity,environ mental consequence,and management costs.
