7.10 Electrical Measurement and Instrument Device
7.10.1 For the hydropower station with a computer-based monitoring and control system,the configuration of electrical measuring instruments shall be simplified.If there is a requirement for remote measurement,the information should be transferred by the computer-based monitoring and control system.(https://www.daowen.com)
7.10.2 If a time-division charge is required,an electric energy measurement device shall be installed.