《GB 50071-2014小型水力发电站设计规范:英文》简介

更新于 2026年10月10日 版权声明

《GB 50071-2014小型水力发电站设计规范:英文》这本书是由.中国工程建设标准化协会组织编译创作的,《GB 50071-2014小型水力发电站设计规范:英文》共有102章节

1

中华人民共和国住房和城乡建设部公告

第1128号 住房城乡建设部关于发布《小型水力发电站设计规范》等两项国家标准英文版的公告 现批准《小型水力发电站设计规范》GB 50071-2014、《小型水电
阅读
2

Introduction to English Version

Department of International Cooperation,Science and Technology of Ministry of Wa
阅读
3

目录

目 录 中华人民共和国住房和城乡建设部公告 Introduction to English Version Foreword 1 General Provisi
阅读
4

Foreword

In accordance with provisions of 2011 Document for Developing and Revising Stand
阅读
5

1 General Provisions

1.0.1 This Code is formulated to satisfy the needs for construction and developm
阅读
6

2 Hydrology

(https://www.daowen.com)
阅读
7

2.1 General Requirements

2.1.1 In hydrological analysis and computation,the following data shall be colle
阅读
8

2.2 Runoff

2.2.1 Computation of runoff shall provide all or part of the following informati
阅读
9

2.3 Flood

2.3.1 All or parts of the following design flood results at dam(plant)sites shal
阅读
10

2.4 Rating Curve

2.4.1 If there is a hydrometrical gauging station in the vicinity of the dam(pla
阅读
11

2.5 Sediment,Evaporation,Ice Regime

2.5.1 All or part of the following sediment information at the dam(plant)site sh
阅读
12

2.6 Automatic Hydrological Telemetry System

2.6.1 The necessity for setting up an automatic hydrological telemetry system sh
阅读
13

3 Engineering Geology Investigation

(https://www.daowen.com)
阅读
14

3.1 General Requirements

3.1.1 Engineering-geological investigation shall include basic geological condit
阅读
15

3.2 Regional Geology

3.2.1 Available regional geological data of project site shall be studied to loc
阅读
16

3.3 Engineering Geology of Reservoirs

3.3.1 The investigation of reservoir seepage shall include: 1 Existence of thin
阅读
17

3.4 Engineering Geology of Hydraulic Structures

3.4.1 The investigation into the site of an earth-rock dam shall include: 1 Stra
阅读
18

3.5 Natural Construction Material

3.5.1 For natural building materials,an initial investigation or detailed invest
阅读
20

4.1 General Requirements

4.1.1 The principle of integrated water resources management shall be insisted i
阅读
21

4.2 Computation of Runoff Regulation

4.2.1 In the computation of runoff regulation,the data that shall be gathered in
阅读
22

4.3 Flood Regulation and Selection of Characterist...

4.3.1 In the computation of flood regulation,techno-economic comparison shall be
阅读
23

4.4 Selection of Normal Water Level and Dead Water...

4.4.1 For the selection of normal storage level,several options shall be formula
阅读
24

4.5 Selection of Installed Capacity and Type of Hy...

4.5.1 Installed capacity shall be selected on the basis of analysis of regulatin
阅读
25

4.6 Selection of Dimensions of Power Waterway and ...

4.6.1 For diversion type hydropower stations,the dimensions of headrace and the
阅读
26

4.7 Analysis of Reservoir Sedimentation and Backwa...

4.7.1 If the ratio of storage capacity to annual sediment volume flowing into th
阅读
27

4.8 Reservoir Operation Mode and Operational Chara...

4.8.1 The reservoir operation mode shall be proposed based on the defined parame
阅读
29

5.1 General Requirements

5.1.1 The scales of projects and the grades of structures shall meet the followi
阅读
30

5.2 General Layout of Project

5.2.1 Dam site(or dam axis)and powerhouse site shall be selected after techno-ec
阅读