4.1.6 Preventive Test for Aerial Devices with Insu...

更新于 2026年10月10日 版权声明
4.1.6 Preventive Test for Aerial Devices with Insulating Booms

Preventive test for aerial devices with insulating booms includes the power-frequency voltage-withstand test and leakage current test for insulating working bucket,power frequency voltage withstand test and leakage current test for insulation arm,the power-frequency voltage-withstand test and leakage current test for the entire aerial devices with insulating booms,and the breakdown strength test for insulating hydraulic oil,and the test period should be half a year.(https://www.daowen.com)

↑上一章 ↓下一章
关注公众号获取验证码
复制内容需要验证码(7.99元/天)