In recent years,the development of infrastructure construction in China has been...
2
Foreword by Qihu Qian
Since entering the 21st century,with the continuous development of economy,the c...
3
Preface
Since the beginning of the twenty-first century,the construction scale and const...
4
目录
Foreword by Jun Sun Foreword by Qihu Qian Preface 1 Introduction 1.1 Development...
5
1 Introduction
The underwater tunnel crossing the underwater strata of rivers or straits has th...
6
1.1 Development and Application of Large Diameter ...
The idea of underwater tunnel construction was first proposed by British enginee...
7
1.2 Common Technical Difficulties in Large Diamete...
Due to China's vast territory and large differences in geological conditions,in ...
8
1.3 Significance and Application Prospect of Under...
Nowadays slurry shield technology has been widely used in underwater tunnel cons...
9
2 Large Diameter Shield Initiation and Arrival Tec...
Shield initiation and arrival are the two processes most prone to accidents in s...
10
2.1 Shield Initiation and Arrival Construction Met...
...
11
2.1.1 Main Construction Methods of Shield Initial ...
Shield initiation refers to the use of temporary assembly segments and other rea...
12
2.1.2 Construction Method of Shield Arrival
The arrival construction of shield machine refers to the whole construction proc...
13
2.2 Strata Reinforcement at Initiation and Arrival...
...
14
2.2.1 Soil Precipitation Technology
When the shield enters and exits the hole,due to the high pressure head of the d...
15
2.2.2 Soil Reinforcement Method
In the past,grouting method was the main method for stratum reinforcement at the...
16
2.2.3 Scope of Soil Reinforcement
In this section,taking the deep mixing pile construction method as an example,th...
17
2.3 Shield Tunneling Initial Construction Technolo...
This section takes Nanjing Yangtze River Tunnel as an example to introduce the c...
18
2.3.1 Initial Construction of Auxiliary Engineerin...
1)Construction of initial reaction frame. The reaction frame is a circular reinf...
19
2.3.2 Installation of Negative Loop Pipe and Box C...
1)Negative loop pipe assembly The positioning of the first ring of negative loop...
20
2.3.3 Broken of the Door of Tunnel
In order to ensure the stability of the retaining structure of the original well...
21
2.3.4 Control of Driving Parameters in the Initial...
1)Idling position The cutter head does not need to rotate,no mud,Jack propulsion...
22
2.4 Construction Technology of Shield Arrival
Compared with the construction of interval tunnel,the arrival of shield has its ...
23
2.4.1 Installation and Construction of Receiving P...
The structure of the receiving pedestal is the same as the original pedestal,and...
24
2.4.2 Breaking and Temporary Sealing of the Tunnel...
1)Broken of tunnel door When the shield reaches the back of the continuous wall,...
25
2.4.3 The Arrival Section of the Shield Machine is...
1)Shield positioning and compound measurement of the position of the entrance at...
26
2.4.4 Control of Driving Parameters in the Arrival...
1)Slurry pressure When calculating mud pressure,the groundwater level is 5 m.Aft...
27
3 The Key Technology of Large Diameter Shield Tunn...
The construction of large diameter shield shallow overburden is one of the diffi...
28
3.1 Analysis of Construction Difficulties of Large...
...
29
3.1.1 Technical Difficulties
When shield method is used to construct shallow overburden tunnel in water area(...
30
3.1.2 The Present Situation of Technology
1)Tunnel anti-floating technology When the tunnel passes through the saturated u...