References
References
Anagnostou,G.,and K.Kovari.1994.The face stability of slurry-shield-driven tunnel.Tunneling and Underground Space Technology 9(2):165-174.
Broere,W.2001.Tunnel face stability and new CPT applications.Delft:Delft University of Technology.
Chen,Jian.2014.Summary of key construction technologies for super large diameter slurry shield crossing the Yangtze River.Modern Tunnel Technology 51(S1):81-86.
China Standardization Committee.2007.Bentonite:GB/T 20973-2007.Beijing:China Quality Inspection Press.
Fritz,P.,R.Hermanns Stengele,and A.Heinz.2002.Modified bentonite slurries for slurry shields in highly permeable soils.In 4th international symposium geotechnical aspects of underground construction in soft ground,Toulouse.
Guo,Xinjun,and Hongwei Dai.2013.Super-large diameter shield tunnel crossing the Yangtze River construction technology.Beijing:China Construction Industry Press.
Guo,Xinjun,Fanlu Min,Xiaochun Zhong,and Wei Zhu.2012.Nanjing Yangtze River tunnel engineering difficulties analysis and key technology summary.Rock Mechanics and Engineering Journal 31(10):2154-2160.
Han,Xiaorui.2009.Research on the formation law of slurry shield slurry film based on the matching between slurry and stratum.Nanjing:Hehai University.
Han,Yuewang.2009.The influence mechanism of consolidation-cement characteristics of grouting body behind shield wall on formation deformation.Nanjing:Hehai University.
Heinz,A.2006.Modifizierte Bentonitsuspensionenfir geotechnische Bauverfahren in Boden hoher Durchlassigkeit.Zurich:Swiss Federal Institute of Technology ETH.
Kim,S.H.,and F.Tonon.2010.Face stability and required support pressure for TBM driven tunnels with ideal face membrane-drained case.Tunnelling and Underground Space Technology 25(5):526-542.
Li,Liang.2010.Study on the mechanism and countermeasures of embankment damage under high strength mining.China University of Mining and Technology.
Li,Yun,and Zixin Zhang.2007.Research on the influence of slurry penetration on the stability of shield excavation face.Underground Space and Engineering(04):720-725+750.
Liu,Xueyan,and Dajun Yuan.2014.Sludge pressure setting to prevent slurry fracturing during shield tunneling.Journal of Civil Engineering 47(05):128-132.
Minfan,Road.2012.Study on permeability law of slurry in stratum and slurry film formation of slurry pressure shield.Nanjing:Hehai University.
©Shanghai Scientific and Technical Publishers 2022 291
J.Chen et al.,Construction Technology of Large Diameter Underwater Shield Tunnel,Key Technologies for Tunnel Construction under Complex Geological and Environmental Conditions,https://doi.org/10.1007/978-981-16-5896-9
Minfan,Road,Teng Jiang,Daiwei Wei,and Asia Zhang.2014.Experimental study on mud preparation and mud film formation of slurry shield under pressure.Tunnel Construction 34(09):857-861.
Minfan,Road,Jingbo Xu,Jiarui Du,and Huitang Xing.2015.Experimental study on slurry preparation and film formation of large diameter slurry shield gravel sand stratum.Modern Tunnel Technology 52(06):141-146.
Troops,Xuemei Xu,and Hongwei Xia.2017.Analysis of hidden dangers of trenchless dike crossing technology in dike reinforcement.Flood Control and Drought Relief in China 27(02):97-98.
Wang,Fei.2012.Study on slope stability analysis and reinforcement measures of embankment engineering.Hefei University of Technology.
Wang,Mingsheng.2015.Research on the key construction technology of slurry shield ofNanchang subway crossing Ganjiang shallow covering permeable layer.Tunnel Construction Set 35(11):1222-1228.
Wang,Hai,and Xiaochun Zhong.2013.Influence of slag removal efficiency of slurry shield slurrywater separation system on slurry.Tunnel Construction 33(11):928-932.
Wang,Song,and Yong Wang.2014.Construction technology of shield tunnel in water.Shanxi Building 40(05):171-172.
Watanabe,T.,and H.Yamazaki.1981.Giant size slurry shield is a success in Tokyo.Tunnels and Tunnelling 13(1):13-17.
Wei,Liangwen,Qinghe Zhang,and Zhongyi Deng.2007.Stability mechanism and application of large slurry shield tunnel excavation face.Underground Space and Engineering(01):87-91.
Wu,Shiming,Cungang Lin,Zhongmiao Zhang,and Ning Wang.2011.Risk analysis and control of slurry shield undercrossing embankment.Journal of Rock Mechanics and Engineering 30(05):1034-1042.
Xinghuitang.2010.Nanjing Yangtze River tunnel construction technology of slurry shield crossing the super shallow Earth section of the Yangtze River.Modern Tunnel Technology 47(02):68-73.
Yao,Xianli.2010.The application of casing drilling method in pile pulling construction ofNanjing Metro Line 2.Tunnel Construction Set 30(01):48-52+62.
Yin,Luchao,Zhenhong Zhu,and Yuzhen Li.1999.Japan tunnel shield new technology.Wuhan:Huazhong University of Technology Press.
Yuan,Dajun,Fan Yin,Huawei Wang,Qingfei Huang,and Heng Xiao.2009.Ultra-large diameter slurry shield tunneling on soil disturbance research.Rock Mechanics and Engineering 28(10):2074-2080.
Yuan,Dajun,Qingfei Huang,Xinggao Li,et al.2010.Study on the phenomenon of slurry splitting and stretching in clay stratum under shield tunneling.Journal of Geotechnical Engineering 32(05):712-717.
Zhang,Asia.2016.Surface subsidence and collapse caused by large-diameter slurry shield tunnel construction.Nanjing:Hehai University.
Zhang,Zhongan.2016.Application of steel sleeve in shield reception of subway tunnel.Railway Standard Design 60(02):110-113.
Zhang,Fengxiang,Hehua Zhu,and Deming Fu.2004.Shield tunnel.Beijing:People's Transportation Press.
Zhang,Qinghe,Shentang Wang,Changzheng Yan,and Wei Zhang.2004.The construction technology countermeasures of shield tunnel crossing shallow overburden under water.Rock Mechanics and Engineering(05):857-861.
Zhou,Wenbo.2004.Shield tunnel construction technology and application.Beijing:China Construction Industry Press.
2014.Calculation and analysis of shallow soil thickness of shield tunnel crossing Inland River.Tianjin University.
2014.Mud management in slurry shield construction of subway tunnel.Construction(05):58-59.
2017.Discussion on construction technology of slurry shield shallow overburden.Construction Mechanization 38(09):45-47.