1.2 The Key Construction Engineering Technology Ba...
The third-front construction has to face the actual conditions of material shortage and low level of industrialization.It is also necessary to solve difficulties of distributed layout as much as possible to ensure the smooth progress of manufacture.The outstanding achievement of China in the 1960s and the 1970s was a solid establishment of technology independence in terms of ideas,and actions got rid of the initial influence of the Soviet Union.A huge amount of practical projects have accumulated experience in such a short period.This is precisely what China has long lacked due to the very weak industrial foundation.The study selected three foremost issues,the side-wall support technology,loess collapsed foundations and building construction codes.(https://www.daowen.com)